Planning a Bathroom Renovation: 7 Steps to Your Dream Bathroom
Plan a bathroom renovation in 7 steps: budget, needs, advice, materials, quotes, schedule (usually 1–3 weeks) and handover. Tips from a plumber in Riehen.
Planning a bathroom renovation properly
If you clarify budget, wishes and schedule before the first appointment, you will have fewer surprises on site.
Step 1: Set the budget
First define your budget and the scope of the renovation:
- Simple renovation: only replace the sanitary fixtures
- Medium renovation: including tiles
- Complete renovation: including planning and design
Step 2: Analyse your needs
Ask yourself the following questions:
- How many people use the bathroom every day?
- Do you need a bathtub or is a shower enough?
- Should the bathroom be barrier-free?
- How much storage space do you need?
Step 3: Get professional advice
An experienced plumber can help you understand the technical possibilities and limitations. At AQUARO we offer a free on-site consultation.
Step 4: Choose design and materials
Choose materials that are durable and easy to care for:
- Tiles: porcelain stoneware is particularly robust
- Built-in furniture: made-to-measure solutions make the best use of the space
Step 5: Hire the tradespeople
Get at least 3 quotes and compare not only the price but also:
- References and experience
- Warranty terms
- Fixed-price offers
Step 6: Draw up a schedule
Depending on the scope, a typical bathroom renovation takes between 1 and 3 weeks. A simple replacement of taps and tiles can be done in 3–5 days. The work follows this order:
- Demolition
- Rough-in plumbing
- Tiling
- Fitting the sanitary fixtures
- Finishing work
Step 7: Handover and documentation
Inspect the finished bathroom together with the tradesperson and have all warranty documents handed over to you.
What determines the price
What a bathroom renovation costs can only be said after a look on site. These points make the biggest difference:
- Scope: Are only fixtures and taps replaced, or is the bathroom stripped back to the bare shell?
- Pipes: Can the existing water and waste pipes stay, or do they have to be replaced? Moving the toilet or shower to another spot requires new connections.
- Bath or shower: A walk-in shower flush with the floor needs a fall and a low-lying drain. In older buildings this is not always easily possible.
- Materials: Tiles, taps and furniture come in very different price ranges.
- Access: If everything has to be carried by hand through a narrow stairwell, even a small bathroom takes more time.
Ask for the quote to be broken down item by item. That way you can see where you can save without saving on the technology inside the wall.
In a rented flat or in condominium ownership
If you rent, you need the landlord's written consent to renovate the bathroom (Art. 260a of the Swiss Code of Obligations (OR)). Also record in writing whether you must restore the original condition when you move out.
In condominium ownership (Stockwerkeigentum), pipes that supply several flats usually belong to the common parts. If they are to be replaced or reconnected, discuss this with the property management early on.
During the works
The bathroom cannot be used during the renovation. Plan for this early:
- Is there a second toilet or shower in the house? If not, arrange an alternative bathroom with family or neighbours
- Inform the neighbours in good time about noisy demolition work, and in an apartment building the property management too
- If the water has to be shut off for the whole building, inform all residents beforehand
- Agree on a place for materials and rubble
- Move dust-sensitive items out of the adjoining rooms
Checklist
- Write down your budget and wishes
- Note the room dimensions, take photos
- Arrange an on-site consultation
- Compare quotes: what is included?
- Set a schedule, think of a second toilet
When to call a professional
- As soon as pipes are moved or renewed
- For planning the shower, bathtub and drains
- For a binding quote